Burbank, WA. Ice Harbor Dam personnel installed an advanced technology turbine, the first of its kind, on June 8, 2018. This fixed blade turbine runner was designed by U.S. Army Corps of Engineers personnel and Voith for power efficiency and to optimize the safety of fish navigating through Snake River dams.
| Date Taken: | 06.08.2018 |
| Date Posted: | 12.26.2018 19:29 |
| Photo ID: | 4999499 |
| VIRIN: | 180608-A-AZ289-1484 |
| Resolution: | 3712x5568 |
| Size: | 2.71 MB |
| Location: | BURBANK, WASHINGTON, US |
| Hometown: | TRI-CITIES, WASHINGTON, US |
| Hometown: | WALLA WALLA, WASHINGTON, US |
| Web Views: | 37 |
| Downloads: | 5 |
This work, Ice Harbor Advanced Technology Turbine Runner, by Brigida Sanchez, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.