Charleston District is deepening Charleston Harbor to 52 feet. Work is currently going on in the entrance channel with several dredges deepening the harbor. A hard bottom reef is being built using the dredged material from the entrance channel.
Date Taken: | 08.20.2018 |
Date Posted: | 12.11.2018 13:11 |
Photo ID: | 4964799 |
VIRIN: | 180820-A-FL382-312 |
Resolution: | 3648x5472 |
Size: | 9.98 MB |
Location: | CHARLESTON, SC, US |
Web Views: | 10 |
Downloads: | 3 |
This work, If you build it, they will come [Image 2 of 2], by Sean McBride, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT