Tommy Hollowell, geologist with the U.S. Army Corps of Engineers Nashville District, chips away bedrock while geo-mapping Center Hill Lake’s roller compacted concrete berm Nov. 21, 2018 in Silver Point, Tenn. (USACE photo by Ashley Webster)
Date Taken: | 11.21.2018 |
Date Posted: | 11.30.2018 14:12 |
Photo ID: | 4938154 |
VIRIN: | 181121-A-DK677-1004 |
Resolution: | 5032x3355 |
Size: | 8.43 MB |
Location: | SILVER POINT, TN, US |
Web Views: | 123 |
Downloads: | 4 |
This work, Next construction phase gets rolling at Center Hill’s auxiliary dam [Image 6 of 6], by Ashley Webster, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT