Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Transit Protection System Construction at Port Angeles’ Ediz Hook Concludes [Image 1 of 8]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Transit Protection System Construction at Port Angeles’ Ediz Hook Concludes

    SILVERDALE, WASHINGTON, UNITED STATES

    09.14.2018

    Photo by Petty Officer 2nd Class Vaughan Dill 

    Navy Public Affairs Support Element, Det. Northwest

    180914-N-SH284-0032 PORT ANGELES, Wash. (Sept. 14, 2018) Coast Guard Cmdr. Thomas Evans, commanding officer, Maritime Force Protection Unit-Bangor, speaks to a crowd during a ribbon-cutting ceremony for the official opening of the Transit Protection System facilities at the U.S. Coast Guard Air Station Sector Field Office, Port Angeles. The project consisted of constructing a pier, utility trestle, and an alert forces facility which will meet the U.S. Coast Guard’s personnel requirements when they provide escort services to the Navy’s submarine forces. (U.S. Navy photo by Mass Communication Specialist 2nd Class Vaughan Dill/Released)

    IMAGE INFO

    Date Taken: 09.14.2018
    Date Posted: 09.15.2018 18:53
    Photo ID: 4735483
    VIRIN: 180914-N-SH284-0032
    Resolution: 4333x2889
    Size: 687.69 KB
    Location: SILVERDALE, WASHINGTON, US

    Web Views: 30
    Downloads: 5

    PUBLIC DOMAIN