The world's largest concrete 3D printer constructs a 500-square-foot barracks hut at the U.S. Army Engineer Research and Development Center in mid-August in Champaign, Illinois. Marine Corps Systems Command teamed up with Marines from I Marine Expeditionary Force to conduct a field user evaluation to inform future requirements for cutting-edge technology and autonomous systems. (Courtesy photo)
Date Taken: | 08.22.2018 |
Date Posted: | 08.23.2018 20:25 |
Photo ID: | 4672569 |
VIRIN: | 180822-M-ZZ999-005 |
Resolution: | 803x565 |
Size: | 184.29 KB |
Location: | CHAMPAIGN, ILLINOIS, US |
Web Views: | 161 |
Downloads: | 26 |
This work, MCSC teams with Marines to build world’s first continuous 3D-printed concrete barracks [Image 3 of 3], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.