Barney Schulte, technical engineer for Kentucky Lock Addition Project, checks specifications for the gantry crane lift system in preparation for the movement of a 1.3 million pound concrete shell Aug. 4, 2018 into the downstream riverbed to form a cofferdam. The shell will also be part of the permanent lock wall. (USACE Photo/Mark Rankin)
Date Taken: | 08.04.2018 |
Date Posted: | 08.09.2018 17:32 |
Photo ID: | 4634566 |
VIRIN: | 180804-A-BO243-1950 |
Resolution: | 6000x4000 |
Size: | 10.19 MB |
Location: | GRAND RIVERS, KENTUCKY, US |
Web Views: | 46 |
Downloads: | 7 |
This work, Heavy concrete shell placement at Kentucky Lock not taken lightly [Image 14 of 14], by Mark Rankin, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.