Contractors prepare a driveway and roadway in Constitution Park for paving July 12, 2018, at Fort McCoy, Wis. Fort McCoy’s Directorate of Public Works coordinated work to have a new road built around the park. Work included placing asphalt down after a gravel base was set. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)
| Date Taken: | 07.12.2018 |
| Date Posted: | 07.26.2018 13:45 |
| Photo ID: | 4589464 |
| VIRIN: | 180712-A-OK556-422 |
| Resolution: | 3826x2551 |
| Size: | 1.85 MB |
| Location: | FORT MCCOY, WISCONSIN, US |
| Web Views: | 3 |
| Downloads: | 3 |
This work, Construction operations at Fort McCoy [Image 56 of 56], by Scott Sturkol, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.