This screenshot from the Contract Management Review Board, with contract specifics removed, represents a product or project manager’s current and projected contracts for a five-year period. The five-year period was chosen to allow users to ensure proper transitions between periods of performance by tracking when contracts are due to expire and planning for follow-on acquisition requirement packages. The system is updated in real time so that users track the most accurate information. The dotted red line on the left marks the current date, and the key in the bottom left corner identifies which contracts have been awarded and which are in the planning stages. The down arrow at the beginning of FY19 indicates the date that the first effort is scheduled to transition to the next project award below. (Image by Justin Rakowski, PEO IEW&S)
Date Taken: | 04.15.2018 |
Date Posted: | 06.07.2018 13:15 |
Photo ID: | 4459155 |
VIRIN: | 180607-A-A4416-002 |
Resolution: | 2175x1417 |
Size: | 1.21 MB |
Location: | US |
Web Views: | 24 |
Downloads: | 3 |
This work, PUTTING THE PIECES TOGETHER [Image 2 of 2], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.