Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    7th MUNS completes first bomb build on new MAC Pad [Image 1 of 10]

    7th MUNS completes first bomb build on new MAC Pad

    DYESS AIR FORCE BASE, TX, UNITED STATES

    05.15.2018

    Photo by Airman River Bruce 

    7th Bomb Wing

    Members of the 7th Munitions Squadron participated in an inert bomb build on a new munitions assembly conveyor pad at Dyess Air Force Base, Texas, May 15, 2018. The 7th Civil Engineer Squadron worked with the 819th RED HORSE Squadron, Malmstrom AFB, Montana, to build this pad from January to May 2018. A munitions assembly conveyor is the primary system used by the 7th MUNS to build bombs in mass quantities. (U.S. Air Force photo by Airman River Bruce)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 05.15.2018
    Date Posted: 05.24.2018 11:14
    Photo ID: 4415085
    VIRIN: 180515-F-GD886-1098
    Resolution: 3924x2685
    Size: 1.5 MB
    Location: DYESS AIR FORCE BASE, TX, US

    Web Views: 20
    Downloads: 3

    PUBLIC DOMAIN