Contract workers work on the Alderwood Dam project on Jan. 23, 2015, on North Post at Fort McCoy, Wis. The project includes removal of the old Alderwood Dam, obliteration of existing asphalt road, removal of muck lake-bottom soils, and the installation of a new precast bridge. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)
| Date Taken: | 01.23.2015 |
| Date Posted: | 05.02.2018 09:49 |
| Photo ID: | 4354956 |
| VIRIN: | 150123-A-OK556-536 |
| Resolution: | 3504x2336 |
| Size: | 4.45 MB |
| Location: | FORT MCCOY, WISCONSIN, US |
| Web Views: | 2 |
| Downloads: | 1 |
This work, 2015 Alderwood Dam Project at Fort McCoy [Image 17 of 17], by Scott Sturkol, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.