Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    5th CES: Installation powerhouse [Image 4 of 6]

    5th CES: Installation powerhouse

    MINOT AIR FORCE BASE, ND, UNITED STATES

    03.20.2018

    Photo by Airman 1st Class Dillon Audit 

    Minot Air Force Base

    Airmen assigned to the 5th Civil Engineer Squadron electric shop repair light fixtures at Minot Air Force Base N.D., March 21, 2018. There are six different shops within the 5th CES electric shop including exterior and interior lighting, fire alarm teams, cathodic and lighting protection, and the airfield lighting teams. (U.S. Air Force photo by Airman 1st Class Dillon J. Audit)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 03.20.2018
    Date Posted: 04.18.2018 13:52
    Photo ID: 4309536
    VIRIN: 180320-F-DJ826-0278
    Resolution: 4928x2464
    Size: 2.78 MB
    Location: MINOT AIR FORCE BASE, ND, US

    Web Views: 15
    Downloads: 4

    PUBLIC DOMAIN