UTUADO, Puerto Rico, Feb. 22, 2018--Staff from several U.S. Congressional committees visit the site of a replacement bridge being constructed in the Rio Abajo area. Once complete the bridge will connect 70 households, that have been cut off since Hurricane Maria, with the rest of the town. FEMA/Eduardo Martinez
Date Taken: | 02.22.2018 |
Date Posted: | 04.03.2018 12:14 |
Photo ID: | 4255538 |
VIRIN: | 180222-O-EM841-822 |
Resolution: | 2042x1361 |
Size: | 3.28 MB |
Location: | PR |
Web Views: | 21 |
Downloads: | 7 |
This work, House Committees Staff visit Collapsed Bridge in Utuado [Image 15 of 15], by Eduardo Martinez, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.