Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Little Goose Navigation Lock Repairs [Image 8 of 8]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Little Goose Navigation Lock Repairs

    WASHINGTON, UNITED STATES

    01.06.2017

    Photo by Jennifer Allen 

    U.S. Army Corps of Engineers Walla Walla District

    Following an emergency outage in 2014 to repair a failing gudgeon arm, additional work was required during the FY17 outage to complete replacement of the aging components of the gate. This project involved replacement of the remaining original gudgeon arm and linkage, replacement of the pintle assembly for both gate leafs. Structural repairs included resurfacing the quoin and miter, and crack repairs to structural members. Repairs are critical to ensure reliable gate operation.

    IMAGE INFO

    Date Taken: 01.06.2017
    Date Posted: 12.30.2017 02:47
    Photo ID: 4058173
    VIRIN: 170106-A-MB149-1008
    Resolution: 4288x2848
    Size: 11.75 MB
    Location: WASHINGTON, US

    Web Views: 17
    Downloads: 6

    PUBLIC DOMAIN