Scott Evertsen, the Arsenal’s energy manager, right, discussing with contract representative Joseph LaVigne about the scope of the contract that will reduce energy costs by replacing hundreds of vapor and fluorescent lights in the manufacturing centers with LED lighting.
Date Taken: | 12.19.2017 |
Date Posted: | 12.20.2017 10:10 |
Photo ID: | 4042225 |
VIRIN: | 171220-A-VT981-0001 |
Resolution: | 2400x3600 |
Size: | 1.61 MB |
Location: | WATERVLIET ARSENAL, NY, US |
Web Views: | 25 |
Downloads: | 5 |
This work, Army Arsenal signs $14.2M contract to reduce costs, become more environmentally compliant [Image 4 of 4], by John Snyder, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT