Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    UCT 2 Removes Chain from Apra Harbor [Image 1 of 2]

    UCT 2 Removes Chain from Apra Harbor

    U.S. Navy Steelworker Chief Brett Sligo, a Seabee with Underwater Construction Team 2 Construction Diving Detachment Alfa (CDDA), works on the bottom of Apra Harbor, Guam on December 7, 2017 to sever a 3 inch mooring chain. CDDA is systematically removing the mooring chains left behind by the former dry dock Ex-Machinist, known locally as “Big Blue”. CDDA Is utilizing exothermic cutting, underwater rigging, lift bag, and crane operations to successfully remove approximately 10,000 feet of 3 inch di-lock chain. CDDA is on the 4th stop of their six-month deployment, where they are conducting inspection, maintenance, and repair of various underwater and waterfront facilities in support of the Pacific Fleet. (U.S. Navy photo by Construction Mechanic 2nd Class Ben McCallum)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 12.07.2017
    Date Posted: 12.11.2017 14:31
    Photo ID: 4018896
    VIRIN: 171207-N-PF688-001
    Resolution: 2546x1430
    Size: 150.56 KB
    Location: GU

    Web Views: 65
    Downloads: 9

    PUBLIC DOMAIN