Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    UCT 2 Removes Mooring Chain from Apra Harbor [Image 1 of 2]

    UCT 2 Removes Mooring Chain from Apra Harbor

    U.S. Navy Construction Electrician 2nd Class Philip Wall, a Seabee with Underwater Construction Team (UCT) 2, Construction Diving Detachment Alfa (CDDA), attaches an air hose to a 3,000lb lift bag in Apra Harbor, Guam on November 16, 2017. CDDA is conducting the systematic removal of 10,000 feet of mooring chain left behind by the former dry dock Ex-Machinist, known locally as “Big Blue”, utilizing various underwater construction techniques. CDDA is on the 4th stop of their six-month deployment, where they are conducting inspection, maintenance, and repair of various underwater and waterfront facilities in support of the Pacific Fleet. (U.S. Navy photo by Construction Mechanic 2nd Class Ben McCallum)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 11.16.2017
    Date Posted: 11.21.2017 11:31
    Photo ID: 3970839
    VIRIN: 171116-N-PF688-002
    Resolution: 2548x1434
    Size: 231.23 KB
    Location: GU

    Web Views: 71
    Downloads: 7

    PUBLIC DOMAIN