Lt. Michael Roster, Officer-in-Charge of Construction Diving Detachment Alfa (CDDA), Underwater Construction Team 2, welds a new anode onto Naval Base Guam’s November Wharf on November 2, 2017. CDDA is restoring the November Wharf at Naval Base Guam by replacing the cathodic protection. This project will extend the facility’s service life providing critical berthing space for U.S. 7th Fleet assets. CDDA is on the last stop of their six-month deployment, where they are conducting inspections, maintenance, and repairs of various underwater and waterfront facilities in support of the U.S. Pacific Fleet. (U.S. Navy photo by Builder 3rd Class John Williams)
Date Taken: | 11.02.2017 |
Date Posted: | 11.07.2017 13:05 |
Photo ID: | 3935174 |
VIRIN: | 171102-N-ZZ999-003 |
Resolution: | 591x362 |
Size: | 32.68 KB |
Location: | GU |
Web Views: | 59 |
Downloads: | 5 |
This work, UCT 2 Restores Guam Wharf [Image 4 of 4], by PO2 Ben McCallum, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT