Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    The Tenacity of Prime Power & the Resolve of Puerto Rico [Image 1 of 3]

    The Tenacity of Prime Power & the Resolve of Puerto Rico

    SAN JUAN, UNITED STATES

    10.22.2017

    Photo by Brigida Sanchez 

    U.S. Army Corps of Engineers South Atlantic Division

    249th Army Engineer Battalion, “Prime Power” Sgt. 1st Class Daniel Grunwald shows Sgt. Brett Knight the where the voltage cables tie in at the “Centro Medico’s” power plant in San Juan, Puerto Rico on October 22, 2017. USACE deployed members of the 249th Engineer Battalion (Prime Power) to assist with the power mission. USACE’s temporary emergency power planning and response teams are assisting with assessments and generator installations at critical facilities in Puerto Rico.

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 10.22.2017
    Date Posted: 10.24.2017 20:43
    Photo ID: 3895580
    VIRIN: 171022-A-AZ289-296
    Resolution: 3712x5568
    Size: 11.91 MB
    Location: SAN JUAN, US
    Hometown: HONOLULU, HI, US
    Hometown: SCHOFIELD BARRACKS, HI, US
    Hometown: SCHOFIELD BARRACKS EAST RANGE, HI, US

    Web Views: 82
    Downloads: 12

    PUBLIC DOMAIN