Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    51st Maintenance Operations Squadron [Image 16 of 18]

    51st Maintenance Operations Squadron

    OSAN AIR BASE, BUSAN GWANG'YEOGSI [PUSAN-KWANGYOKSHI], SOUTH KOREA

    04.04.2011

    Photo by Senior Airman Evelyn Chavez 

    51st Fighter Wing

    Senior Airmen Kevin Benberry and Travis VanCott prepare to load an A-10 with flares and chaff at Osan Air Base, South Korea, April 4. The base is practicing increased security measures during the 2011 Korea Pacific Air Forces Command Operational Readiness Inspection. An ORI is conducted to evaluate and measure the ability of units with a wartime, contingency orforce sustainment mission to perform operations plan and assigned tasks. Inspectable areas include initial response, employment, mission support and ability-to-survive and operate in a chemical environment.

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 04.04.2011
    Date Posted: 04.04.2011 08:34
    Photo ID: 386082
    VIRIN: 110404-F-PB969-004
    Resolution: 1500x2100
    Size: 491.81 KB
    Location: OSAN AIR BASE, BUSAN GWANG'YEOGSI [PUSAN-KWANGYOKSHI], KR

    Web Views: 33
    Downloads: 6

    PUBLIC DOMAIN