Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Multi-component engineers build bridges at River Assault 2017 [Image 1 of 16]

    Multi-component engineers build bridges at River Assault 2017

    FORT CHAFFEE MANEUVER CENTER, AR, UNITED STATES

    07.26.2017

    Photo by Staff Sgt. Roger Ashley 

    412th Theater Engineer Command

    Active Army 502nd Multi Role Bridge Co. Sgt. Kanin Tawalee, a bridge construction engineer, stages a MK2 bridge erection boat on a sandbar while waiting. U.S. Army, Active and Reserve Soldiers join with Active and Reserve Marine components to deploy, construct and assemble an approximately 320 meter floating improved ribbon bridge across the Arkansas River during River Assault 2017, at Fort Chaffee Maneuver Center, Ark., July 26, 2017. River Assault 2017 is a two-week extended combat training exercise held July 15-28 focusing on technical skills, of various service members, culminating with the construction of a floating improved ribbon bridge across the Arkansas River. Operation River Assault is one of the key training events, which demonstrates America’s Army Reserve is the most capable, combat ready, and lethal Federal Reserve Force in the history of the nation.  (U.S. Army Reserve Photo by Staff Sgt. Roger Ashley)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 07.26.2017
    Date Posted: 07.27.2017 01:13
    Photo ID: 3613887
    VIRIN: 170726-A-DM336-441
    Resolution: 3872x2592
    Size: 1.48 MB
    Location: FORT CHAFFEE MANEUVER CENTER, AR, US

    Web Views: 178
    Downloads: 8

    PUBLIC DOMAIN