The 735th Air Mobility Squadron Space-A Passenger Terminal Phase I completed and features a family center with an outdoor play area, on Hickam Field, May 22, 2017. Space-A Passenger Terminal on Joint Base Pearl Harbor-Hickam, Hawaii, entered Phase II of its renovation plan. Phase II involves the shutdown of the main concourse with services operating out of temporary tents. Anticipated completion of the $20.5 million dollar infrastructure project is set for Spring 2018. (U.S. Air Force photo by Tech. Sgt. Heather Redman)
Date Taken: | 05.22.2017 |
Date Posted: | 05.24.2017 17:11 |
Photo ID: | 3418027 |
VIRIN: | 170522-F-ZT243-013 |
Resolution: | 4256x2832 |
Size: | 1.17 MB |
Location: | JOINT BASE PEARL HARBOR-HICKAM, HAWAII, US |
Web Views: | 34 |
Downloads: | 8 |
This work, Hickam’s PAX Terminal renovations enter Phase II [Image 9 of 9], by TSgt Heather Salazar, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.