Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    PAX Terminal to undergo renovations

    PAX Terminal to undergo renovations

    JOINT BASE CHARLESTON, SC, UNITED STATES

    02.23.2017

    Photo by Airman Megan Beatty 

    Joint Base Charleston

    Col. Jimmy Canlas, 437th Airlift Wing commander, swings a sledgehammer to start construction of the new 437th Aerial Port Squadron Passenger Terminal here, Feb. 23, 2017. The passenger terminal is being renovated to improve the facility by adding a new fire suppression system, roof, utility systems, restrooms inside the gated area and a redesigned family room. The passenger terminal will operate out of a temporary facility until construction is complete. Signage is in place to direct passengers and base personnel from the old terminal to the temporary location. (U.S. Air Force Photo/Airman 1st Class Megan Munoz)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 02.23.2017
    Date Posted: 02.24.2017 10:28
    Photo ID: 3186645
    VIRIN: 170223-F-YM277-0020
    Resolution: 4440x3171
    Size: 1.28 MB
    Location: JOINT BASE CHARLESTON, SC, US

    Web Views: 17
    Downloads: 4

    PUBLIC DOMAIN