Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    PAX Terminal to undergo renovations

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    PAX Terminal to undergo renovations

    JOINT BASE CHARLESTON, SOUTH CAROLINA, UNITED STATES

    02.23.2017

    Photo by Airman Megan Beatty 

    Joint Base Charleston

    Col. Jimmy Canlas, 437th Airlift Wing commander, swings a sledgehammer to start construction of the new 437th Aerial Port Squadron Passenger Terminal here, Feb. 23, 2017. The passenger terminal is being renovated to improve the facility by adding a new fire suppression system, roof, utility systems, restrooms inside the gated area and a redesigned family room. The passenger terminal will operate out of a temporary facility until construction is complete. Signage is in place to direct passengers and base personnel from the old terminal to the temporary location. (U.S. Air Force Photo/Airman 1st Class Megan Munoz)

    IMAGE INFO

    Date Taken: 02.23.2017
    Date Posted: 02.24.2017 10:28
    Photo ID: 3186645
    VIRIN: 170223-F-YM277-0020
    Resolution: 4440x3171
    Size: 1.28 MB
    Location: JOINT BASE CHARLESTON, SOUTH CAROLINA, US

    Web Views: 18
    Downloads: 4

    PUBLIC DOMAIN