Col. Jimmy Canlas, 437th Airlift Wing commander, swings a sledgehammer to start construction of the new 437th Aerial Port Squadron Passenger Terminal here, Feb. 23, 2017. The passenger terminal is being renovated to improve the facility by adding a new fire suppression system, roof, utility systems, restrooms inside the gated area and a redesigned family room. The passenger terminal will operate out of a temporary facility until construction is complete. Signage is in place to direct passengers and base personnel from the old terminal to the temporary location. (U.S. Air Force Photo/Airman 1st Class Megan Munoz)
Date Taken: | 02.23.2017 |
Date Posted: | 02.24.2017 10:28 |
Photo ID: | 3186645 |
VIRIN: | 170223-F-YM277-0020 |
Resolution: | 4440x3171 |
Size: | 1.28 MB |
Location: | JOINT BASE CHARLESTON, SC, US |
Web Views: | 17 |
Downloads: | 4 |
This work, PAX Terminal to undergo renovations, by SSgt Megan Beatty, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT