Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    FY17 CSRS Extended NavLock Outage [Image 3 of 9]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    FY17 CSRS Extended NavLock Outage

    WALLA WALLA, WASHINGTON, UNITED STATES

    02.02.2017

    Photo by Brigida Sanchez 

    U.S. Army Corps of Engineers Walla Walla District

    Lt. Col. Damon Delarosa, commander of the U.S. Army Corps of Engineers, Walla Walla District, news media and other visitors record the crane lift of the top sheave on Feb. 2, 2017 at the Ice Harbor Lock and Dam. The media event was held to help bring awareness to the community about the 2016-2017 Extended Navigation Lock Maintenance Outage by showcasing the associated Ice Harbor navigation lock gate hoist machinery upgrade. The upgrade includes replacement of the sheave shafts, pinion gears, ring gears, electrical wiring and operating controls in both lock gate towers.

    IMAGE INFO

    Date Taken: 02.02.2017
    Date Posted: 02.06.2017 18:51
    Photo ID: 3147035
    VIRIN: 170202-A-AZ289-008
    Resolution: 4928x3264
    Size: 5.21 MB
    Location: WALLA WALLA, WASHINGTON, US

    Web Views: 16
    Downloads: 4

    PUBLIC DOMAIN