A maintenance contractor shakes hands with an Afghan Air Force aircraft maintainer on the wing of an A-29 Super Tucano at Hamid Karzai International Airport, Kabul, Afghanistan, Nov. 23, 2016. AAF maintainers recently conducted the first 600-hour aircraft inspection of an A-29. The maintainers were able to complete the three-week inspection with minimal assistance from contractors. (U.S. Air Force photo by Tech. Sgt. Jeffery Marino)
Date Taken: | 11.23.2016 |
Date Posted: | 11.28.2016 17:43 |
Photo ID: | 3016268 |
VIRIN: | 161123-F-HU417-030 |
Resolution: | 5312x2988 |
Size: | 1.07 MB |
Location: | (UNDISCLOSED LOCATION) |
Web Views: | 93 |
Downloads: | 16 |
This work, A-29 Maintenance [Image 15 of 15], by TSgt Christopher Holmes, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT