Chief Warrant Officer 3 Weaver Prosper, the U.S. Army Central operational energy program manager, showcases the features of a recently purchased solar light system on Camp Arifjan, Kuwait, May 16, 2016. The solar light systems are part of an operational energy initiative to reduce USARCENT’s carbon footprint and its reliance on fossil fuels. In the future, USARCENT will replace all of its gas powered light systems with renewable energy platforms. (Photo by U.S. Army Sgt. James Bunn, USARCENT)
Date Taken: | 05.16.2016 |
Date Posted: | 05.20.2016 03:22 |
Photo ID: | 2601135 |
VIRIN: | 160516-A-BS297-001 |
Resolution: | 4928x3264 |
Size: | 986.17 KB |
Location: | CAMP ARIFJAN, KW |
Web Views: | 43 |
Downloads: | 2 |
This work, Solar lighting project moves forward at USARCENT [Image 3 of 3], by SSG James Bunn, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.