Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Electricians Upgrade Power Sub-stations [Image 1 of 8]

    Electricians Upgrade Power Sub-stations

    SCOTT AIR FORCE BASE, IL, UNITED STATES

    04.09.2016

    Photo by Senior Airman Joshua Eikren 

    375th Air Mobility Wing

    Donald Topper, 375th Civil Engineer Squadron Exterior Work Leader, installs a temporary grounding rod to ensure proper grounding before working on the power lines during a scheduled power outage April 9, 2016 at Scott Air Force Base, Ill. The purpose of the scheduled power outage was to repair critical high voltage electrical components at sub-stations on base. (U.S. Air Force Photo/Senior Airman Joshua Eikren)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 04.09.2016
    Date Posted: 04.15.2016 14:54
    Photo ID: 2527068
    VIRIN: 160409-F-MJ664-008
    Resolution: 3683x5516
    Size: 6.2 MB
    Location: SCOTT AIR FORCE BASE, IL, US

    Web Views: 46
    Downloads: 4

    PUBLIC DOMAIN