Soldiers with Headquarters and Headquarters Battalion, 1st Cavalry Division set up deployable rapid assembly shelter tents at Fort Hood, Texas, Feb. 9 during the start of the battalion’s Maverick ramp up. First Team staffers will continue to train, including conducting a culminating exercise in March, to ensure they are prepared to execute any mission. (U.S. Army photo by Staff Sgt. Christopher Calvert, 1st Cavalry Division Public Affairs (released))
| Date Taken: | 02.09.2016 |
| Date Posted: | 02.17.2016 14:33 |
| Photo ID: | 2406599 |
| VIRIN: | 160209-A-WD324-058 |
| Resolution: | 3456x2304 |
| Size: | 3.92 MB |
| Location: | FORT HOOD, TEXAS, US |
| Web Views: | 9 |
| Downloads: | 4 |
This work, First Team executes Maverick ramp up [Image 5 of 5], by SSG Christopher Calvert, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.