Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    UCT 2 conducts pier repair [Image 1 of 2]

    UCT 2 conducts pier repair

    PEARL HARBOR, HI, UNITED STATES

    02.01.2016

    Courtesy Photo

    Underwater Construction Team 2

    160201-N-ZZ999-001 PEARL HARBOR (Feb. 1, 2016) - Steelworker 1st Class Jesse Hamblin, assigned to Underwater Construction Team(UCT) 2, brazes lead wires to steel reinforcing bar as part of a new cathodic protection system. UCT 2’s Construction Dive Detachment Alfa (CDDA) is conducting pier repair on Joint Base Pearl Harbor Hickam to help prolong Third Fleet assets. CDDA is on the first stop of their deployment, where they are conducting inspection, maintenance, and repair of various underwater and waterfront facilities in support of the Pacific Fleet. (U.S. Navy photo by Construction Mechanic 3rd Class Ben McCallum/Released)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 02.01.2016
    Date Posted: 02.05.2016 14:53
    Photo ID: 2386625
    VIRIN: 160201-N-ZZ999-001
    Resolution: 4000x3000
    Size: 3.36 MB
    Location: PEARL HARBOR, HI, US

    Web Views: 18
    Downloads: 3

    PUBLIC DOMAIN