Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    UCT 2 conducts pier repairs [Image 1 of 2]

    UCT 2 conducts pier repairs

    PEARL HARBOR, HI, UNITED STATES

    01.21.2016

    Courtesy Photo

    Underwater Construction Team 2

    160120-N-ZZ999-001 PEARL HARBOR (Jan. 20, 2016) - Chief Equipment Operator James McVicar delivers a final brief to Builder 2nd Class Jesus Saucedo and Builder 2nd Class Zach Schulte before they enter the water. The divers from Underwater Construction Team (UCT) 2's Construction Dive Detachment Alfa (CDDA) are preparing to perform a final inspection dive before concrete is poured on a pile restoration. CDDA is conducting pier repair on Joint Base Pearl Harbor Hickam to help prolong Third Fleet assets. CDDA is on the first stop of their deployment, where they are conducting inspection, maintenance, and repair of various underwater and waterfront facilities in support of the Pacific Fleet. (U.S. Navy photo by Construction Mechanic 3rd Class Ben A. McCallum/Released)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 01.21.2016
    Date Posted: 01.25.2016 15:40
    Photo ID: 2369116
    VIRIN: 160119-N-ZZ999-001
    Resolution: 4032x3024
    Size: 2.72 MB
    Location: PEARL HARBOR, HI, US

    Web Views: 48
    Downloads: 7

    PUBLIC DOMAIN