Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Civil engineering projects: from beginning to end [Image 3 of 5]

    Civil engineering projects: from beginning to end

    F.E. WARREN AIR FORCE BASE, WY, UNITED STATES

    11.10.2015

    Photo by Senior Airman Jason Wiese 

    90th Missile Wing

    Tech. Sgt. Mike Rich, 90th Civil Engineer Squadron Pavements and Equipment, uses a bull float to smooth out large sections of newly poured concrete outside the Chadwell Dining Facility on F.E. Warren Air Force Base, Wyo., Nov. 10, 2015. The 90th CES Airmen complete a wide range of maintenance and construction projects each year. (U.S. Air Force photo by Senior Airman Jason Wiese)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 11.10.2015
    Date Posted: 12.07.2015 14:16
    Photo ID: 2318568
    VIRIN: 151110-F-BR137-022
    Resolution: 2598x3912
    Size: 6.55 MB
    Location: F.E. WARREN AIR FORCE BASE, WY, US
    Hometown: PHILADELPHIA, PA, US

    Web Views: 22
    Downloads: 4

    PUBLIC DOMAIN