Tim Amalong, airframe mechanic, grinds bolts on an F-15A Eagle on the flightline at Davis-Monthan Air Force Base, Ariz., Nov. 19, 2015. A team of contractors, including Amalong, took five days to completely disassemble the aircraft and load it onto two flatbed trucks to be shipped to Joint Base Lewis-McChord, Wash., for display. The entire project is estimated to take approximately eight months from the planning stage to finish. (U.S. Air Force photo by Airman Basic Nathan H. Barbour/Released)
| Date Taken: | 11.19.2015 |
| Date Posted: | 11.24.2015 12:21 |
| Photo ID: | 2304427 |
| VIRIN: | 151119-F-ID393-023 |
| Resolution: | 3184x2120 |
| Size: | 855.1 KB |
| Location: | TUCSON, ARIZONA, US |
| Web Views: | 13 |
| Downloads: | 7 |
This work, F-15A disassembled at D-M [Image 7 of 7], by SrA Nathan Barbour, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.