A team of contractors measure the height of an F-15A Eagle vertical stabilizer on the flightline at Davis-Monthan Air Force Base, Ariz., Nov. 18, 2015. The team took five days to completely disassemble the aircraft and load it onto two flatbed trucks to be shipped to Joint Base Lewis-McChord, Wash., for display. The entire project is estimated to take approximately eight months from the planning stage to finish. (U.S. Air Force photo by Airman Basic Nathan H. Barbour/Released)
Date Taken: | 11.18.2015 |
Date Posted: | 11.24.2015 12:19 |
Photo ID: | 2304425 |
VIRIN: | 151118-F-ID393-011 |
Resolution: | 2888x1984 |
Size: | 934.98 KB |
Location: | TUCSON, AZ, US |
Web Views: | 22 |
Downloads: | 9 |
This work, F-15A disassembled at D-M [Image 7 of 7], by SrA Nathan Barbour, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT