Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    UCT 2 conducts pier repair [Image 1 of 2]

    UCT 2 conducts pier repair

    PEARL HARBOR, HI, UNITED STATES

    01.01.2013

    Courtesy Photo

    Underwater Construction Team 2

    151116-N-ZZ999-001 PEARL HARBOR (Nov. 16, 2015) - Builder 2nd Class Ben Reed, assigned to Underwater Construction Team (UCT) 2, ensures all gaps and small holes are plugged on wood bracing to minimize leakage during underwater concrete operations. UCT 2’s Construction Dive Detachment Charlie (CDDC) is conducting pier repair on Joint Base Pearl Harbor-Hickam to help prolong Third Fleet assets. CDDC is on the fourth stop of their deployment, where they are conducting inspection, maintenance, and repair of various underwater and waterfront facilities in support of the Pacific Fleet. (Photo by Builder 2nd Class Joseph Hophan/Released)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 01.01.2013
    Date Posted: 11.23.2015 12:52
    Photo ID: 2302289
    VIRIN: 151116-N-ZZ999-001
    Resolution: 3000x2250
    Size: 2.18 MB
    Location: PEARL HARBOR, HI, US

    Web Views: 45
    Downloads: 7

    PUBLIC DOMAIN