Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Phase inspection Airmen keep Osan’s aircraft fixed right, ready to fight [Image 1 of 5]

    Phase inspection Airmen keep Osan’s aircraft fixed right, ready to fight

    OSAN AIR BASE, SOUTH KOREA

    11.16.2015

    Photo by Staff Sgt. Amber Grimm 

    51st Fighter Wing

    Airman 1st Class Cody Alleman, 51st Maintenance Squadron phase dock crew chief, remove screws from a tail panel on an A-10 Thunderbolt II during a routine phase inspection at Osan Air Base, Republic of Korea, Nov. 16, 2015. Panel removal is the first step in the in-depth inspection and preventive maintenance regiment the airframe must undergo after every 500 flight hours. (U.S. Air Force photo/Staff Sgt. Amber Grimm)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 11.16.2015
    Date Posted: 11.22.2015 22:08
    Photo ID: 2301405
    VIRIN: 151116-F-CV567-007
    Resolution: 6016x4016
    Size: 7.08 MB
    Location: OSAN AIR BASE, KR

    Web Views: 12
    Downloads: 8

    PUBLIC DOMAIN