Texas Air National Guard Staff Sgt. Melissa Dundon, left, and Staff Sgt. Peter Del Bosque, 455th Expeditionary Communications Squadron cable and antenna systems installers, cut a piece of fiber cable July 8, 2015, at Bagram Air Field, Afghanistan. The engineering and installations team is responsible for installing fiber and copper cables throughout the base that impact flying missions and network systems, including NATO communications. (U.S. Air Force photo by Senior Airman Cierra Presentado/Released)
Date Taken: | 07.08.2015 |
Date Posted: | 07.13.2015 07:30 |
Photo ID: | 2057971 |
VIRIN: | 150708-F-QU482-004 |
Resolution: | 5560x3969 |
Size: | 7.59 MB |
Location: | BAGRAM AIR FIELD, AF |
Web Views: | 16 |
Downloads: | 5 |
This work, Engineering and installations team keeps the BAF missions running [Image 5 of 5], by TSgt Cierra Presentado, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.