Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Engineering and installations team keeps the BAF missions running [Image 2 of 5]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Engineering and installations team keeps the BAF missions running

    BAGRAM AIR FIELD, AFGHANISTAN

    07.08.2015

    Photo by Senior Airman Cierra Presentado 

    455th Air Expeditionary Wing   

    Texas Air National Guard Staff Sgt. Peter Del Bosque, 455th Expeditionary Communication Squadron cable and antenna systems installer, unravels fiber cable July 8, 2015, at Bagram Air Field, Afghanistan. The engineering and installations team is responsible for installing fiber and copper cables throughout the base that impact flying missions and network systems, including NATO communications. (U.S. Air Force photo by Senior Airman Cierra Presentado/Released)

    IMAGE INFO

    Date Taken: 07.08.2015
    Date Posted: 07.13.2015 07:32
    Photo ID: 2057965
    VIRIN: 150708-F-QU482-002
    Resolution: 3094x4334
    Size: 6.25 MB
    Location: BAGRAM AIR FIELD, AF

    Web Views: 22
    Downloads: 6

    PUBLIC DOMAIN