Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    FRCSE nondestructive inspection shop receives equipment upgrade [Image 2 of 3]

    FRCSE nondestructive inspection shop receives equipment upgrade

    NAVAL AIR STATION JACKSONVILLE, FL, UNITED STATES

    04.22.2015

    Photo by Victor Pitts 

    Fleet Readiness Center Southeast

    NAVAL AIR STATION JACKSONVILLE, Fla. – (From left) Dale Perry, processes branch head, Randy Mullins, nondestructive inspection (NDI) supervisor, Ray Penn, metals inspector supervisor, Fleet Readiness Center Southeast (FRCSE) executive officer Capt. Chuck Stuart, David Schuster, process engineer supporting NDI, Major Nimock, manufacturing product director, and Josh Loukus, vice president of REL Inc., cut the ribbon on the new fully-automated fluorescent penetrant inspection (FPI) line in the nondestructive inspection (NDI) shop April 22. The FPI line will allow the shop to process and estimated 160-200 parts per day by 2020. (U. S. Navy photo by Victor Pitts/Released)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 04.22.2015
    Date Posted: 04.28.2015 07:39
    Photo ID: 1901557
    VIRIN: 150422-N-UL949-001
    Resolution: 2079x1487
    Size: 2.43 MB
    Location: NAVAL AIR STATION JACKSONVILLE, FL, US

    Web Views: 48
    Downloads: 1

    PUBLIC DOMAIN