The final process of the road improvements conducted on Strawberry Hill, on the Victory Base Complex was to run the smooth faced roller across the road and provide a finished look to the road. The heavy equipment operators of the 277th Engineer Company, based in San Antonio, used the roller to shift the surface and the earth beneath the roller and make proper compaction on the road.
Date Taken: | 07.06.2009 |
Date Posted: | 07.09.2009 03:33 |
Photo ID: | 186345 |
VIRIN: | 090706-A-6993V-460 |
Resolution: | 1024x768 |
Size: | 672.61 KB |
Location: | BAGHDAD, IQ |
Web Views: | 70 |
Downloads: | 20 |
This work, 277th Engineers improve Liberty access road [Image 4 of 4], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.