CORONADO, Calif. (March 10, 2015) – Builder 2nd Class Matt Dawson, from Chicago, assigned to the Underwater Construction Team (UCT) 2, uses a table saw to cut a piece of wood. Naval Mobile Construction Battalion 4 and UCT 2 are replacing two boat ramps, which are scheduled to be completed in May for future operations. (U.S. Navy photo by Mass Communication Specialist 3rd Class Emiline L. M. Senn/Released)
Date Taken: | 03.10.2015 |
Date Posted: | 03.12.2015 15:28 |
Photo ID: | 1811484 |
VIRIN: | 150310-N-OR184-028 |
Resolution: | 4164x2974 |
Size: | 1.74 MB |
Location: | CORONADO, CA, US |
Hometown: | CHICAGO, IL, US |
Web Views: | 39 |
Downloads: | 2 |
This work, Seabees replace boat ramp [Image 5 of 5], by PO1 Emiline Senn, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT