Airmen with the Expeditionary Prime Base Engineer Emergency Force Squadron work together to lower a new shower cadillac into place at an undisclosed location in Southwest Asia March 4, 2015. EPBS does cradle to grave construction consisting of small to medium construction projects from programming to real estate capitalization. Greenleaf is currently deployed from the 183rd Civil Engineer Squadron out of Abraham Lincoln Capital Airport in Springfield, Ill. (U.S. Air Force photo/Tech. Sgt. Marie Brown) (RELEASED)
| Date Taken: | 03.04.2015 |
| Date Posted: | 03.07.2015 02:03 |
| Photo ID: | 1801767 |
| VIRIN: | 150304-F-BW907-124 |
| Resolution: | 4512x3008 |
| Size: | 5.88 MB |
| Location: | (UNDISCLOSED LOCATION) |
| Web Views: | 23 |
| Downloads: | 2 |
This work, Choice cuts: BEEFing up the base [Image 12 of 12], by MSgt Beatrice Brown, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.