Engineman 2nd Class Cheng Lee takes a water sample in preparation to start the main engines aboard the littoral combat ship USS Fort Worth (LCS 3). Currently on a 16-month rotational deployment in support of the Asia-Pacific Rebalance, Fort Worth is a fast and agile warship tailor-made to patrol the region’s littorals and work hull-to-hull with partner navies, providing 7th Fleet with flexible capabilities it needs now and in the future. (U.S. Navy photo by Mass Communication Specialist 2nd Class Antonio P. Turretto Ramos) (RELEASED)
| Date Taken: | 01.29.2015 |
| Date Posted: | 02.03.2015 23:46 |
| Photo ID: | 1750569 |
| VIRIN: | 150129-N-DC018-135 |
| Resolution: | 4246x2995 |
| Size: | 1.54 MB |
| Location: | CHANGI NAVAL BASE, SG |
| Web Views: | 32 |
| Downloads: | 3 |
This work, Scheduled preventive maintenance for the littoral combat ship USS Fort Worth (LCS 3) [Image 8 of 8], by Antonio Turretto Ramos, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.