The electrical panel shown here was not to National Electrical Code standards prior to the rewiring which was located outside 3d Sustainment Command (Expeditionary) headquarters building June 2008. The 3d ESC electrical engineer team rewired their headquarters building for the safety of its service members working here.
Date Taken: | 03.03.2009 |
Date Posted: | 05.06.2009 08:30 |
Photo ID: | 170013 |
VIRIN: | 090506-A-3912S-001 |
Resolution: | 768x1024 |
Size: | 359.85 KB |
Location: | BALAD, IQ |
Web Views: | 152 |
Downloads: | 12 |
This work, 3d Sustainment Command-Wired for Safety [Image 3 of 3], by 1SG Reginald Smith, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.