Seabees from Amphibious Construction Battalion Two (ACB-2) Little Creek design and construct a floating handicap ramp. This ramp is a permanent fixture on the pier it is designed to move up, down, back and forth with the movement of the waves. ACB-2 is conducting humanitarian and disaster relief operations as a part of Operation Unified Response after to the 7.0 earthquake Jan 12. (U.S. Navy photo by Mass Communication Specialist 2nd Class Meranda Keller)
| Date Taken: | 02.10.2010 |
| Date Posted: | 05.14.2014 23:57 |
| Photo ID: | 1338236 |
| VIRIN: | 100209-N-PA426-002 |
| Resolution: | 2804x1963 |
| Size: | 697.6 KB |
| Location: | HT |
| Web Views: | 15 |
| Downloads: | 1 |
This work, Seabees build ramp [Image 3 of 3], by PO1 Meranda Keller, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.