Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    New Horizons construction progress on schedule [Image 29 of 42]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    New Horizons construction progress on schedule

    BELIZE CITY, BELIZE

    04.09.2014

    Photo by Tech. Sgt. Kali Gradishar 

    Air Forces Southern

    Belize Defence Force Sgt. Thomas Salam, BDF Light Engineer Company engineer, right, hands a block to U.S. Air Force Senior Airman Eric Barahona, New Horizons structures engineer from the 99th Civil Engineer Squadron at Nellis Air Force Base, Nev., while constructing the walls of a school facility at the Stella Maris School Belize Academy for the Deaf construction site April 9, 2014, in Belize City, Belize. The site is one of five sites throughout Belize receiving new facilities built by U.S. military and Belize Defence Force engineers. The construction is part of New Horizons Belize 2014, an exercise geared toward mutual training and cooperation amongst Belize Defence Force, Canadian military, U.S. Air Force, U.S. Army and U.S. Marine Corps members. The opening ceremonies for the event are scheduled 10 a.m. April 10 at the Edward P. Yorke school in Belize City, Belize. (U.S. Air Force photo by Tech. Sgt. Kali L. Gradishar/Released)

    IMAGE INFO

    Date Taken: 04.09.2014
    Date Posted: 04.09.2014 22:11
    Photo ID: 1236244
    VIRIN: 140409-F-EE220-079
    Resolution: 2040x2562
    Size: 1.71 MB
    Location: BELIZE CITY, BZ

    Web Views: 19
    Downloads: 3

    PUBLIC DOMAIN