Construction continues on the asphalt and concrete located at Ramp 1 and 2 March 29. The project began March 14 and is projected for completion at the end of November 2011. (U.S. Air Force photo/Airman 1st Class Matthew B. Fredericks)
| Date Taken: | 03.29.2011 |
| Date Posted: | 04.01.2014 14:00 |
| Photo ID: | 1211959 |
| VIRIN: | 110329-F-XF291-098 |
| Resolution: | 4288x2848 |
| Size: | 6.8 MB |
| Location: | SPANGDAHLEM AIR BASE, DE |
| Web Views: | 12 |
| Downloads: | 1 |
This work, Construction in Germany [Image 8 of 8], by TSgt Matthew Fredericks, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.