Airmen from the 557th Expeditionary Rapid Engineer Deployable, Heavy Operations Repair Squadron Engineer, work on construction of a new fitness center at an undisclosed location in Southwest Asia, Dec. 5, 2013. The fitness center is scheduled to be complete by April 2014. (U.S. Air Force photo by Tech. Sgt. Colleen Urban/Released)
| Date Taken: | 12.05.2013 |
| Date Posted: | 12.08.2013 07:49 |
| Photo ID: | 1067848 |
| VIRIN: | 131205-F-KG397-008 |
| Resolution: | 4608x2880 |
| Size: | 1.64 MB |
| Location: | (UNDISCLOSED LOCATION) |
| Web Views: | 23 |
| Downloads: | 2 |
This work, New fitness construction continues [Image 5 of 5], by Colleen Urban, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.