DynCorp International jet mechanic Maggie Bedford checks the functionality of a J85-5 engine from a T-38 aircraft on Dec. 4, 2013, at Sheppard Air Force Base, Texas. All aircraft engines are required to have a performance check before they are installed into an aircraft. (U.S. Air Force photo by Frank Carter/Released)
| Date Taken: | 12.04.2013 |
| Date Posted: | 12.04.2013 16:16 |
| Photo ID: | 1065853 |
| VIRIN: | 131204-F-NS900-001 |
| Resolution: | 2784x1755 |
| Size: | 5.16 MB |
| Location: | SHEPPARD AIR FORCE BASE, TEXAS, US |
| Web Views: | 98 |
| Downloads: | 13 |
This work, Checking the functionality of a J85-5 engine from a T-38 aircraft [Image 11 of 11], by Frank Carter, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.