Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    School Under Construction

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    09.09.2004

    Courtesy Video

    DVIDS Hub       

    School from outside, man shovels mud into wheelbarrow. Inside, another man lays down tile. Two workers hammer on a wall and two men paint a ceiling. Then a look at the finished work outside and inside the renovated school - clean and painted. A ceiling fan is turned on in one room. Interview with Master Sergeant Robert Kolesar, a team leader with the 425th Civil Affairs Battalion (out of Santa Barbara, California). He talks about offering to renovate the school after seeing bad damage and goes through the improvements undertaken. Describes poor condition of the school beforehand. Militia occupying the school caused some of the damage. U.S. taxpayer money is used. Says schools are the future of the country and that repairing them has the biggest impact for the community. Also see "School Damage Repaired" in this section for more b-roll and related interviews.

    LEAVE A COMMENT

    VIDEO INFO

    Date Taken: 09.09.2004
    Date Posted: 09.15.2004 06:07
    Category: B-Roll
    Video ID: 590
    Filename: 040911_Schools_Under_Construction_Najaf
    Length: 00:10:01
    Location:

    Video Analytics


    Downloads: 0
    High-Res. Downloads: 0

    PUBLIC DOMAIN