Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Center Hill Dam Hydropower Turbine Model Meets Design Specifications

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    CENTER HILL DAM, TN, UNITED STATES

    10.08.2014

    Video by Leon Roberts 

    U.S. Army Corps of Engineers, Nashville District

    U.S. Army Corps of Engineers Nashville District officials witnessed a hydropower turbine model test at Voith Hydro’s S. Morgan Smith Memorial Laboratory Oct. 6-9, 2014 in York, Pa. The tests measured the performance of the turbine to ensure it meets the required specifications before the manufacturing process and work to modernize the power house at Center Hill Dam in Lancaster, Tenn., begins. The tests were completely successful and the positive results will keep the Center Hill Hydropower Rehabilitation Project schedule on track.

    LEAVE A COMMENT

    VIDEO INFO

    Date Taken: 10.08.2014
    Date Posted: 10.16.2014 10:30
    Category: Package
    Video ID: 367265
    VIRIN: 141008-A-EO110-050
    Filename: DOD_102036260
    Length: 00:03:21
    Location: CENTER HILL DAM, TN, US

    Video Analytics


    Downloads: 4
    High-Res. Downloads: 4

    PUBLIC DOMAIN