Elected officials joined the U.S. Army Corps of Engineers and project partners for a media event and site tour of the Folsom Dam auxiliary spillway project in Folsom, Calif., April 26, 2014, to celebrate the transition from concrete placement to gate installation later this summer. The project is part of a $900-million cooperative effort to improve the safety of Folsom Dam and reduce flood risk for the Sacramento area.
Date Taken: | 04.26.2014 |
Date Posted: | 04.26.2014 21:50 |
Category: | B-Roll |
Video ID: | 332698 |
VIRIN: | 140626-A-AN535-001 |
Filename: | DOD_101467555 |
Length: | 00:04:46 |
Location: | FOLSOM, CA, US |
Downloads: | 2 |
High-Res. Downloads: | 2 |
This work, Corps Hosts Elected officials, Partners to Celebrate Progress on Folsom Spillway (b-roll), by John Prettyman, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT